Control of Microorganisms in Drinking Water
Prepared by the Water Supply Engineering Technical Committee of the Infrastructure Council of the Environmental and Water Resources Institute of ASCE. ...

Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...

Storm-Water Strategy
Water pollution laws are certainly nothing new, but increased public scrutiny, beach closures, and media coverage�particularly in Orange County, California�have placed new pressures on...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

Water for Ahwatukee
Scheduled for completion in August, the South Mountain Water Facilities pipeline will increase drinking water capacity to the community of Ahwatukee Foothills, a rapidly growing south...

The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....

Improving the Process
By revamping its solids treatment system, the wastewater utility in Louisville, Kentucky, eliminated odors, created a potential source of new revenue, and saved millions of dollars in...

Clean Water at the Crossroads
Thirty years after the passage of the Clean Water Act, the quality of effluent from the nation's wastewater treatment plants has improved considerably. However, much of the...

Rapid Delivery
Facing nearly dry wells and a moratorium on development that was about to expire, a small town in the pacific Northwest, using the design/build delivery method, was able to quickly design...

Natural Progression
Engineers made storm-water detention, wetlands mitigation, and environmental safeguarding part and parcel of an industrial expansion project. Designers have created an inviting front yard...

Environmental Technology Verification Report for the Plasma Enhanced Melter
Prepared by the Environmental Technology Evaluation Center (EvTEC), a service center of CERF/IIEC. This Technology Verification report describes the...

Application of a SonTek Argonaut Side-Looking (SL) Doppler Flow Meter for Measuring Discharge on the Southern Leg of the Parana' River at the Entrance to the Itaipu Binacional Reservoir, Parana', Brasil
Index-velocity and water level data collected with a SonTek Argonaut Side-Looking (SL) Doppler Flow Meter and channel cross-sectional area data were used to compute total discharge on...

Establishing Baselines For Pipeline Condition Master Planning
As our most of our cities approach complete built-out and much of our wastewater pipelines near the end of their design life, attention needs to be focused on retiring deteriorated first...

Uses and Limitations of Conventional Hydraulic Models in the Planning and Design of Storage Tunnels
The hydraulic design of storage tunnels requires special considerations relative to the design of conventional sewers. These issues include characterization and control of inflows, energy...

Quality Control Test for Prestressing Wires in Concrete Pressure Pipe
Prestressed concrete cylinder pipe (PCCP) was introduced in 1942 as a high pressure capacity conduit for water transmission. The principal element of the design and construction that imparts...

 

 

 

 